• Community Center lower hall lights have been repaired.
  • The broken stair rail from the gazebo to the dance floor has been repaired.
  • Repaired light covers in the lower hall
  • Drywall repair to district office windows BY HIGH COUNYRY DRYWALL 760-772-3222
  • Installed new lattice panel in the lower kitchen access area and added new security panel
  • Installed 2 new mini blinds in the up stairs kitchen
  • Repaired and replaced the main community hall flag pole lights
  • Installed new moldings in the main office to the community message board 
  • New metered light timer on the horse shoe pit for cost savings
  • repaired drinking fountain
  • installed new flag pole lighting and new flags
  • installed flag pole lighting
  • installed wrought fencing at planters
  • painted trim around doors/windows
  • painted hand rails too up stairs areas​
  • REMOVED BROKEN OLD CABINET IN THE KITCHEN ​AND RE ARIANGED APPLIANCES TO ACCESS EXISTING MAINTEANCE  CLOSET.
  • REMOVED OLD BROKEN MINI BLIND IN KITCHEN WINDOWS
  • UPDATED KITCHEN STORAGE ROOM FLOOR,PAINT, CABINET LOCKS.
  • INSTALLED TWO REMAINING LED LAWN AREA LIGHTS DONATED COSMIC SOLAR
  • INSTALLED 3 NEW TREES IN FRONT LAWN AREA GRANT PROGRAM BILL HORN
  • INSTALLED NEW PLANTINGS (GARDEN CLUB ) AT FRONT OF HALL
  • INSTALLED LIGHTING OVER ELEVATOR ACCESS DOOR
  • INSTALLED 4 NEW LIGHT POLES BAND STAND AREA DONATED COSMIC SOLAR
  • PLANTED 3 NEW 24' BOX TREES DONATED LAJOLLA GARDEN CLUB
  • REMOVED OLD PALM TREES LAWN AREA
  • COMMUNITY HALL SIGN RE FINIUSHED
  • TRIMMED ALL TREES AROUND HALL AND LAWN
  • PLANTED NEW SUCCELENT GARDEN EAST SIDE OF BUILDING
  • FIXED DRIVE WAY AT EAST SIDE PARKING LOT (VCPRD)
  • PAINTED GAZEBO POLES AND FACIA TO MACH BAND STAND.

The Valley Center Building Committee’s sole purpose is to raise, receive and disburse funds for the expansion and maintenance of the Valley Center Community Center as well as assisting the Parks and Recreation Department in its efforts to expand the park system in the unincorporated community of Valley Center.

Community Center Work Completed List

Community Hall


Wish List 201​8

Please take the time to donate below and preserve our heritage and support the Valley Center Building Committee efforts!

The History

The Valley Center Community Center was the second school house in the rural area built in 1922. It was built after the one-room school burnt down in the late 1800’s. The building is owned and managed by the Valley Center Parks and Recreation District.

We need your help to preserve our heritage!

  • DONATE  $$
  • wood floor refinishing room 3&5
  • PAINTERS WANTED BRUSH WORK
  • SEAL COAT DRIVE AREAS
  • RE FINISTHUP STAIRS WOOD WALKWAYS
  • REMODEL UP STAIRS KITCHEN
  • Replacement ( 4 ) light poles  at Pavilion with single light fixture style.
  • .





Valley Center Building Committee Inc. is a corporation organized and operated exclusively for charitable purposes within the meaning of Section 501(c) (3) of the Internal Revenue Code. #1111714


 